結局スクラムってなんなの?
14,502
閲覧
3,113
埋め込み先での閲覧
89
ページ
アジャイルひよこクラブ 2017年12月定例イベント講演資料
テキスト
1
Kiro Harada Attractor Inc. 2017/12/21
3
New New Product Development Game (1986) https://hbr.org/1986/01/the-new-new-product-development-game/ar/1
4
Japan as Number 1 - 1979
6
DOD-2167A - 1988
7
1989 1. 2. 3. 4. 5.
8
2016 1.Apple 2.Alphabet 3.Microsoft 4.Amazon 5.Facebook
9
“The principal object of management should be to secure the maximum prosperity for the employer, coupled with the maximum property for each employee”
10
“The important object of both the workmen and the management should be the training and development of each individual in the establishment, so that he can do (at his fastest pace and with the maximum of efficiency) the highest class of work for which his natural abilities fit him.” ( )
13
1900 : Thinkers and Doers
17
http://commons.wikimedia.org/wiki/File:Tabulating_Machine_Co_Organization_Chart.jpg
19
(1924-1932) http://en.wikipedia.org/wiki/Hawthorne_effect
20
http://www.library.hbs.edu/hc/hawthorne/
25
“The great majority of workmen still believe that if they were to work at their best speed they would be doing a great injustice to the whole trade by throwing a lot of men out of work.” The principles of scientific management - Frederick Taylor
26
-
27
(1924) http://commons.wikimedia.org/wiki/File:1924_Non-Stop_Shuttle_Change_Toyoda_Automatic_Loom,_Type_G_1.jpg
28
: 60 1
29
The Machine that Changed the World (1990) Toyota’s Secret Weapon in the Global Car Wars Based on IMVP Phase 2 study (1984-1990)
30
1990
31
the expenditure of resources in any aspect other than the direct creation of value for the end customer to be wasteful, and thus a target for elimination.
32
7 Wastes - Muda Transportation( Inventory( ) ) Over-Processing ( ) Motion( ) Over-Production ( ) Waiting( ) Defects( )
33
Figure curtesy of Satoshi Kuroiwa
35
TPS ,
36
TPS
37
(1924) http://commons.wikimedia.org/wiki/File:1924_Non-Stop_Shuttle_Change_Toyoda_Automatic_Loom,_Type_G_1.jpg
38
1950
39
TWI (Training Within Industry) (1940 - 1945)
41
To make your work Easier and Safer
42
Council's Committee on Work in Industry, of which Dr. Lawrence J. Henderson, Director of the Fatigue Laboratory a t H a r v a r d University, was made chairman. This committee made a n extensive rt1pol.t which called attention to three problems : (1) selection of supervisors, ( 2 ) training and development of supervisors, and ( 3 ) intensified problems of supervision arisillg from the emergency situation. I n connection with supervisory development, the committee recommended that training be directed toward "improving and accelerating the training of supervisors in handling the human situations under their charge so a s to secure maximum cooperation." When this report was received by Mr. Hillman? he asked Training Within Industry t o formulate such a training plan. Job Relations / T W O YEARS OF JOB RELATIONS DEVELOPMENT T W I Headquarters obtained the services of F. J. Roethlisberger and J o h n B. Fox of Harvard University and L. J. O'Rourke of the Civil Service Commission, to work with Walter Dietz, Associate Director of TWI, and other Headquarters staff nlembers i n determining a method of attack and making preliminnry plans for experimental work. Determining Supervisory Needs I n August 1941 TWI sent out a questionnaire on supervisory needs to several hundred supervisors and their own bosses. When replies to t h e supervisory questionnaire were receired i t was found t,hat
43
TWI
44
NUMMI ( Tesla)
45
: Ada Lovelace
46
Management the Development of Large Software Systems a.k.a.
47
http://en.wikipedia.org/wiki/KUKA#mediaviewer/File:BMW_Leipzig_MEDIA_050719_Download_Karosseriebau_max.jpg
48
Successful 14% Challenged 54% Cancelled 32% Chaos Report / 1994
49
I ANALYSIS PROGRAM DESIGN I I SYSTEM I coo,.o TESTING ANALYSIS PROGRAM DESIGN I coo,.o I OPER TESTING I OPERATIONS Figure 2. Implementation steps to develop a large computer program for delivery to a customer. Figure 2. Implementation steps to develop a large computer program for delivery to a customer. I believe in this concept, but the implementation described above is risky and invites failure. The problem is illustrated in Figure 4. The testing phase which occurs at the end of the development cycle is the first event for timing,concept, storage, input/output but transfers, the etc., are experienced as distinguished from I believe inwhich this implementation described above is risky and invites failure. The analyzed. These phenomena are not precisely analyzable. They are not the solutions to the standard partial differential equations of mathematical physics for instance. Yet if these phenomena fail to satisfy the various oblem is illustrated Figure The testing which external constraints, in then invariably a major4. redesign is required. A simple octal phase patch or redo of some isolated occurs at the end of the development cycle is the code will not fix these kinds of difficulties. The required design changes are likely to be so disruptive that the Winston W. Royce (1970). "Managing the Development of Large Software st event for which timing, storage, input/output transfers, etc., areSystems" experienced asof Western distinguished from in: In: Technical Papers Electronic Show and Convention software requirements upon which the design is based and which provides the rationale for everything are violated. Either the requirements must be modified, or a substantial change in the design is required. In effect (WesCon) August 25–28, 1970, Los Angeles, USA. in 1970 alyzed. These phenomena are not precisely analyzable. They are not the solutions to the standard partia and/or costs. the development process has returned to the origin and one can expect up to a lO0-percent overrun in schedule One might note that there has been a skipping-over of the analysis and code phases. One cannot, of
50
The Oregon Experiment (1975) , Christopher Alexander
52
(1977)
53
(1979)
54
"At the core... is the idea that people should design for themselves their own houses, streets and communities. This idea... comes simply from the observation that most of the wonderful places of the world were not made by architects but by the people". Christopher Alexander et al., A Pattern Language, front bookflap
55
" ". Christopher Alexander et al., A Pattern Language, front bookflap
58
Nature of Order (2004)
60
(1993)
61
Wiki Wiki Web
62
Hillside Group
63
Pattern Language of Programs (PLoP)
66
WORK QUEUE INFORMAL LABOR PLAN DEVELOPER CONTROLS PROCESS SOMEONE ALWAYS MAKES PROGRESS COMMUNITY OF TRUST INTERRUPTS UNJAM BLOCKING PROGRAMMING EPISODE NAMED STABLE BASES ENGAGE CUSTOMERS TAKE NO SMALL SLIPS SURROGATE CUSTOMER ENGAGE QUALITY ASSURANCE GROUP VALIDATION COMPLETION HEADROOM RECOMMITMENT MEETING SCENARIOS DEFINE PROBLEM TEAM PRIDE FIREWALLS SIZE THE ORGANIZATION SELF SELECTING TEAM UNITY OF PURPOSE 3 TO 7 HELPERS PER ROLE PATRON ROLE PRODUCERS IN THE MIDDLE FEW ROLES PRODUCER ROLES ORGANIZATION FOLLOWS LOCATION HOLISTIC DIVERSITY COUPLING DECREASES LATENCY DISTRIBUTE WORK EVENLY MOVE RESPONSIBILITIES RESPONSIBILITES ENGAGE SHAPING CIRCULATION REALMS
67
( —M. Conway )
69
OODA - 1976 http://en.wikipedia.org/wiki/OODA_loop
72
New New Product Development Game (1986) https://hbr.org/1986/01/the-new-new-product-development-game/ar/1
73
New New Product Development Game (1986) Built-in instability Self-organizing project teams Overlapping development phases Multilearning Subtle control Organizational transfer of learning https://hbr.org/1986/01/the-new-new-product-development-game/ar/1
74
- 1995 How Japanese Companies Create the Dynamics of Innovation
75
SECI SECI, Ba and Leadership: a United Model of Dynamic Knowledge Creation Ikujiro Nonaka, Ryoko Toyama and Noboru Konno
77
“A human being should be able to change a diaper, plan an invasion, butcher a hog, conn a ship, design a building, write a sonnet, balance accounts, build a wall, set a bone, comfort the dying, take orders, give orders, cooperate, act alone, solve equations, analyze a new problem, pitch manure, program a computer, cook a tasty meal, fight efficiently, die gallantly. Specialization is for insects.” -Robert A. Heinlein
78
“ ” R.A.
80
Scrum 1990’s EASEL Company (Jeff Sutherland) ADM Company (Ken Schwaber) 1995 OOPSLA Paper 2002 Agile Project Management with Scrum (Ken and Mike Beedle)
81
Scrum: Demo or Die
82
Agile Manifesto We are uncovering better ways of developingsoftware by doing it and helping others do it.Through this work we have come to value: Individuals and interactions over processes and tools Working software over comprehensive documentation Customer collaboration over contract negotiation Responding to change over following a plan That is, while there is value in the items onthe right, we value the items on the left more.
83
The Toyota Way (2003)
84
ScrumPLoP (2010- )
87
http://qz.com/196200/toyota-is-becoming-more-efficient-by-replacing-robots-with-humans/
89
Scrum Scrum :